HPE ProLiant DL325 Gen10 User Manual page 37

Table of Contents

Advertisement

Prerequisites
Before you perform this procedure, make sure that you have a T-15 Torx screwdriver available.
Procedure
1. Install the access panel.
2. Install the server into the rack.
3. Connect all peripheral cables to the server.
4. Connect each power cord to the server.
5. Connect each power cord to the power source.
6. Power up the server.
7. If removing the riser blank from primary riser, remove the primary riser cage.
8. Remove the riser blank.
Primary riser slot 1
Primary riser slot 2
Operations
37

Advertisement

Table of Contents
loading

Table of Contents