HPE ProLiant DL325 Gen10 User Manual page 93

Table of Contents

Advertisement

b. Install a hot-plug power supply in power supply bay 2. Perform step 13.
15. Install the access panel.
16. Install the rail on chassis.
17. Install the server into the rack.
18. Connect the power cords to the power supplies.
19. To prevent accidentally disconnecting power cord when sliding the server into and from the rack, secure the power
cord in the strain relief strap attached to the power supply handle:
a. Unwrap the strain relief strap from the power supply handle.
b. Bend the plug end of the power cord in the position shown in the following image.
c. Secure the power cord with the strain relief strap.
20. Power up the server.
Hardware options installation
93