Overall Configuration Procedure
Figure 8.
Network Button Panels • Hardware Features and Installation — Wall-mountable Models
Step 2: Prepare the installation site.
Step 3: Change buttons or faceplates, if desired.
Step 4: Cable the NBPs and the control processor or HCR
Within Global Configurator
(GC Professional or
GC Plus mode):
Step 5: Configure the IP settings of each
NBP and of the control processor or receiver.
If desired or required, install a new
security certi cate (via Toolbelt).
Create a new GC Professional or GC Plus project
and add the control processor or receiver to it.
Create monitors, schedules, timers, macros,
Add NBP button panels and con gure the buttons.
Build and upload the con guration to
make adjustments, nalize con guration.
Overall Installation and Configuration Steps
Step 1: Get ready.
receiver, then apply power.
Con gure ports.
and local variables.
Save the project.
the controller or receiver.
Cable all other devices.
Step 7: Test the system,
Step 8: Mount the NBPs.
See the network
network
communication
communication
setup instructions
setup instructions
on page 18.
8
Need help?
Do you have a question about the IP Link Pro NBP 50 and is the answer not in the manual?
Questions and answers