Eaton Powerware 9390-160/100 Installation And Operation Manual page 210

Table of Contents

Advertisement

Installation Information
CAN
NOTE: This drawing is for parallel wiring purposes and is not a floor layout plan.
UPMs can be placed in any physical order.
From UPM 1 CAN Card
J3–8 (L)
J3–9 (H)
J3–10 (Shield)
TWISTED PAIR
UPM 1
CAN CARD J3
A-42
EATON Powerware
UPM
UPM
1
2
PARALLEL SYSTEM CAN (PULL CHAIN) WIRING
CAN Wiring Terminations
To UPM 2 CAN Card
J3–8 (L)
J3–9 (H)
J3–10 (Shield)
TWISTED PAIR
UPM 2
CAN CARD J3
PARALLEL SYSTEM CAN WIRING
9390 UPS (100–160 kVA) Installation and Operation Manual S 164201554 Rev E powerware.com
®
UPM
3
(IF INSTALLED)
(IF INSTALLED)
To UPM 3 CAN Card
(If Installed)
J3–8 (L)
J3–9 (H)
J3–10 (Shield)
TWISTED PAIR
UPM 3
CAN CARD J3
(IF INSTALLED)
DESCRIPTION:
INTERFACE WIRING INSTALLATION
NOTES AND TERMINAL LOCATIONS
DRAWING NO:
164201554---8
REVISION:
D
PULL CHAIN
UPM
4
To UPM 4 CAN Card
(If Installed)
J3–8 (L)
J3–9 (H)
J3–10 (Shield)
UPM 4
CAN CARD J3
(IF INSTALLED)
SHEET:
DATE:
081505
10 of 13

Advertisement

Table of Contents
loading

Table of Contents