Eaton Powerware 9390-160/100 Installation And Operation Manual page 195

Table of Contents

Advertisement

REMOVE DEBRIS SHIELD
COVERING EXHAUST GRILL
BEFORE OPERATING SYSTEM.
CONDUIT LANDINGS FOR
X-SLOT CONNECTIONS.
(REMOVE PANELS TO DRILL OR
PUNCH CONDUIT HOLES.)
BOTTOM ENTRY CONDUIT
LANDING FOR AC INPUT AND
OUTPUT, DC INPUT, DC
CONTROL, AND INTERFACE
CONNECTIONS.
(REMOVE PANEL TO DRILL OR
PUNCH CONDUIT HOLES.)
EATON Powerware
9390 UPS (100–160 kVA) Installation and Operation Manual S 164201554 Rev E powerware.com
®
TOP VIEW
DESCRIPTION:
DRAWING NO:
REVISION:
Installation Information
TOP ENTRY CONDUIT LANDING
FOR AC INPUT AND OUTPUT,
DC INPUT, DC CONTROL, AND
INTERFACE CONNECTIONS.
(REMOVE PANEL TO DRILL OR
PUNCH CONDUIT HOLES.)
BOTTOM VIEW
CONDUIT AND WIRE ENTRY LOCATIONS
164201554---6
DATE:
B
SHEET:
1 of 6
111504
A-27

Advertisement

Table of Contents
loading

Table of Contents