Installation Information
AC INPUT TO UPS
RECTIFIER
AND BYPASS
(SINGLE INPUT)
AC INPUT TO UPS
BYPASS
(DUAL INPUT)
NEUTRAL
TERMINALS
(E12)
OUTPUT
TERMINALS
A-32
EATON Powerware
TERMINAL DETAIL
BYPASS INPUT
TERMINALS
PHASE A (E6)
PHASE B (E7)
PHASE C (E8)
480V INPUT AND 480V OUTPUT
9390 UPS (100–160 kVA) Installation and Operation Manual S 164201554 Rev E powerware.com
®
SINGLE-FEED
RECTIFIER INPUT
JUMPER BUS
TERMINALS
DESCRIPTION:
UPS POWER TERMINAL LOCATIONS
DRAWING NO:
164201554---7
REVISION:
C
PHASE A (E1)
AC INPUT TO
PHASE B (E2)
UPS RECTIFIER
(DUAL INPUT)
PHASE C (E3)
PHASE A (E9)
AC OUTPUT TO
PHASE B (E10)
CRITICAL LOAD
PHASE C (E11)
+
(E4)
DC INPUT
FROM BATTERY
---
(E5)
SHEET:
4 of 4
DATE:
121504