Eaton Powerware 9390-160/100 Installation And Operation Manual page 198

Table of Contents

Advertisement

Installation Information
AC INPUT TO UPS
RECTIFIER
AND BYPASS
(SINGLE INPUT)
AC INPUT TO
UPS RECTIFIER
(DUAL INPUT)
AC OUTPUT TO
CRITICAL LOAD
A-30
EATON Powerware
TERMINAL DETAIL
RECTIFIER INPUT
TERMINALS
(LOCATED ON
CONTACTOR K1)
PHASE A (E1)
PHASE B (E2)
PHASE C (E3)
PHASE A (E9)
PHASE B (E10)
PHASE C (E11)
OUTPUT
TERMINALS
(LOCATED ON
CONTACTOR K3)
208V INPUT AND 208V OUTPUT
9390 UPS (100–160 kVA) Installation and Operation Manual S 164201554 Rev E powerware.com
®
BYPASS INPUT
TERMINALS
DESCRIPTION:
UPS POWER TERMINAL LOCATIONS
DRAWING NO:
164201554---7
REVISION:
B
PHASE A (E6)
AC INPUT TO UPS
PHASE B (E7)
BYPASS
(DUAL INPUT)
PHASE C (E8)
NEUTRAL
TERMINALS
(E12)
+
(E4)
DC INPUT
FROM BATTERY
---
(E5)
SHEET:
2 of 4
DATE:
111504

Advertisement

Table of Contents
loading

Table of Contents