Preparing the installation site

Make sure the installation area is ready for the components.
1. Clear the installation area.
2. Place each component near its installation location.

Lifting and positioning the projector

Safely lift and position the projector in the location where it will be used.
Warning! If not avoided, the following could result in death or serious injury.
A minimum of four people or appropriately rated lift equipment is required to safely lift, install,
or move the product.
Do not install or operate the projector in any position that does not meet the stated product
specifications for alignment and orientation.
This product must be installed in a landscape orientation, with all four feet supported on a level
surface. Do not install or operate the projector in an inverted position. If your site has any installation
requirements other than a typical theater projection booth, contact Christie for assistance.
Before lifting and positioning the projector, refer to the light intensity hazard distances.
1. Position each person at the corners of the projector.
2. Place both hands under the corner, grasping the projector frame.
Do not lift the projector using any feature on the projector cover, such as the cover louvers or
lens opening.
3. Lift up the projector and move it to the location where it will be used.
4. If installing the projector with the optional rack stand adapter (P/N: 163-101103-XX), follow
the instructions provided with that accessory.
For more information on available accessories, see the CP4415-RGB and CP4420-RGB Gen2
Service Guide (P/N: 020-103774-XX).
5. Position the projector so it is centered and parallel with the theater screen.
If space is limited, aim the projector slightly off-center and use lens offset to center the image
on the screen.
Related information
Light intensity hazard distance (on page 8)

Securing the rack stand with foot lock brackets

Complete these steps to secure the rack stand assembly.
Once installation is complete, the rack stand assembly must be secured to the building structure using
the four foot lock brackets provided in the kit (P/N: 108-416102-XX).
1. Place a foot lock bracket over each leveling foot.
2. Secure the bracket to the floor.
CP4415-RGB and CP4420-RGB Gen2 Installation and Setup Guide
020-103773-01 Rev. 1 (02-2023)
Copyright
©
2023 Christie Digital Systems USA, Inc. All rights reserved.
If printed, please recycle this document after use.
Installing and setting up
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cp4420-rgb gen2

Table of Contents