Installing and setting up

Learn how to position and install the projector.

Site requirements

To safely install and operate the CineLife+ 4K-RGB, the installation location must meet these minimum
requirements.
Physical operating environment
Ambient temperature (operating) 10 to 35°C (50 to 95°F)
Humidity (non-condensing) 10% to 80%
Operating altitude 0 to 3000 meters (0 to 9843 feet)
External exhaust ducting
Sufficient ventilation is required around the projector to regulate the temperature of the internal laser
module. If necessary, air intake and exhaust HVAC ducts can be installed.
An exhaust duct is also available for purchase as an optional accessory (P/N: 163-102104-XX).
Instructions for installing the exhaust duct are included with the accessory part.
The installation site must provide an airflow 450 cubic feet per minute (CFM) at 1 to 1000 meters
(3280.8 feet) elevation, and must accommodate a heat load of 4 kW.
For each additional 1000 meters above sea level, increase the airflow (CFM) value by 15%. If an
extraction duct is not used, the operating temperature range is restricted to 10 to 25°C (50 to 77°F) at a
maximum altitude of 3000 meters (9842.5 feet).
Permanent power connection
The projector must be connected to power using a hard-wired connection. The projector light source
(main input) requires the permanent AC connection to operate. There is also an available connector
for an uninterruptible power supply (UPS) to provide backup power for the projector electronics only.
Certified wall breakers are required as part of the installation. Breakers must be part of the building
and easily accessible. The size of the breaker is determined from the power requirements of the
projector and can be up to 30A maximum for the main input and up to 20A maximum for the UPS
input.

Preparing the installation site

Ensure the installation area is ready for the components.
1. Clear the installation area.
2. Place each component near its installation location.
CineLife+ 4K-RGB Installation and Setup Guide–CP4415-RGB, CP4420-RGB, CP4425-RGB, CP4435-RGB
020-103244-06 Rev. 1 (06-2022)
Copyright
©
2022 Christie Digital Systems USA, Inc. All rights reserved.
If printed, please recycle this document after use.
26

Advertisement

Table of Contents
loading

Table of Contents