Chapter 10: Performing Predelivery Checks; Checking Conditioner Drive Belt - MacDon R113 Unloading And Assembly Instructions

Rotary disc header
Table of Contents

Advertisement

Chapter 10: Performing Predelivery Checks

Perform final checks and adjustments as listed on the Predelivery Checklist (yellow sheet at the back of this instruction) to
ensure the machine is field-ready. Refer to the referenced pages as indicated on the Predelivery Checklist for detailed
instructions.
The Operator or the Dealer should retain the completed Predelivery Checklist.

10.1 Checking Conditioner Drive Belt

Ensure that the conditioner drive belt tensioning spring is set at the correct length.
1. Open the left driveshield. For instructions, refer to
Opening Driveshields, page
2. Check that belt (A) is properly tensioned and positioned on
the pulleys. Overall spring length (B) should be 365 mm
(14 3/8 in.). If adjustment is required, refer to
Adjusting Conditioner Drive Belt, page
3. Check that adjuster nuts (C) are tight.
4. Close the driveshield. For instructions, refer to
Driveshields, page
137.
262300
11.1
135.
10.1.1
110.
11.2 Closing
A
Figure 10.1: Conditioner Drive Belt
109
C
B
Revision A

Advertisement

Table of Contents
loading

Table of Contents