Commissioning Mode; Perform Test Of Limit Controls; Perform Test Of Low Gas Pressure Switch; Perform Test Of High Gas Pressure Switch - FULTON Endura EDR Installation, Operation And Maintenance Manual

Condensing hydronic boilers 750,000 - 2,000,000 btu/hr featuring pure control
Table of Contents

Advertisement

OPERATION
!
WARNING
All information in this manual is for
reference and guidance purposes,
and does not substitute for required
professional training, conduct,
and strict adherence to applicable
jurisdictional/professional codes
and regulations.
Non-Fulton product information
is for reference purposes only. No
Fulton document should substitute
for full review of documentation
available from the component
manufacturer.
3-20

Commissioning Mode

This screen is intended for trained factory authorized technicians. Tap the
Complete Commissioning button when setup is fully completed to return to
normal operation.

Perform Test of Limit Controls

Fire the boiler and test the high limit control as follows:
1. Alter high temperature limit to a value lower than the anticipated loop
temperature. Turn the boiler on. Water temperature will rise until the
boiler locks out. This condition has to be manually reset.
2. Alter the high limit cut o temperature to normal level, typically 10-20
degrees above set point.

Perform Test of Low Gas Pressure Switch

Test the low gas pressure switch as follows:
1. With the boiler running turn up the low gas pressure switch until a lock out
is annunciated.
2. Return the switch to normal setting, re-start the boiler.

Perform Test of High Gas Pressure Switch

Test the high gas pressure switch as follows:
1. With the boiler running turn down the high gas pressure switch until a lock
out is annunciated.
2. Return the switch to normal setting, re-start the boiler.
SECTION 3
EDR-PURE-IOM-230608
© Fulton Group N.A., Inc. 2023