FULTON Endura EDR Installation, Operation And Maintenance Manual page 58

Condensing hydronic boilers 750,000 - 2,000,000 btu/hr featuring pure control
Table of Contents

Advertisement

OPERATION
ƒ Before Modifying LMV Parameters
The boiler must be placed in "Commissioning Mode" before
modifying any LMV parameters. Set-up must be fully
completed prior to automatic operation of the boiler.
ƒ Steps to Enter Parameters
ƒ Adjusting Fuel/Air Curve
NOTE:
Fulton Endura boilers are factory test red and pre-programmed with values in the fuel/air curve (P0-ignition to P9-high re).
With the burner on, follow the below steps for making eld changes to the fuel/air curve points. A calibrated ue gas analyzer is
required to complete these steps and must be properly inserted into the boiler ue exhaust vent while making changes to the
fuel/air curve points. The boiler controller must be placed in Commissioning Mode before making any adjustments.
3-6
EDR-PURE-IOM-230608
1) Press and hold the "F" and "A" buttons simultaneously.
a. "Code" will be displayed.
2) When releasing "F" and "A", 7 bars appear the rst of which
ashes.
3) Press the "-" or "+" button to select the rst number of the
national board number and press enter (i/reset) button
after each selected number.
NOTE:
The service password is "00000."
4) After entry of the last number, the password must be
con rmed by pressing enter (i/reset) button.
5) After correct entry of password, PArA appears for a
maximum of 2 seconds.
6) Parameter 400 will ash.
a. Use the "-"or "+" button for scrolling to the desired
parameter.
b. Press the enter (i/reset) button to enter the selected
parameter level.