Sign In
Upload
Manuals
Brands
FULTON Manuals
Boiler
Vantage VTG Series
FULTON Vantage VTG Series Manuals
Manuals and User Guides for FULTON Vantage VTG Series. We have
2
FULTON Vantage VTG Series manuals available for free PDF download: Installation And Operation Manual
FULTON Vantage VTG Series Installation And Operation Manual (149 pages)
Condensing Hydronic Boilers Standard, Dual Fuel, and Low Emissions Models 2,000,000 - 6,000,000 BTU/HR 504k - 1.5 MM kCal/HR
Brand:
FULTON
| Category:
Boiler
| Size: 10.03 MB
Table of Contents
Section 1
3
Table of Contents
3
Introduction
5
Overview
6
Warnings & Cautions
6
Disclaimers and Local Codes
6
Installation
7
Product Overview
8
Placement & Rigging
9
Clearances and Serviceability
10
Install Boiler Trim
12
Install Water Piping
13
Variable Primary Piping Arrangement
14
Primary-Secondary Piping Arrangement
14
Meet Water Chemistry Requirements
17
Prevent Oxygen Contamination
18
Eliminate System Air
18
Fill the Boiler with Water
18
Install Gas Piping
18
Components Requiring Ventilation to the Outdoors
20
Install Condensate Drain
21
Multiple Boilers Sharing a Common Drain Trap
22
Install Ph Neutralization Kit
27
Install #2 Fuel Oil Piping
27
Fuel Oil Piping (for Dual Fuel Gas/Oil Burner)
27
Multiple Burner Installations
29
Hydraulic Connections
29
Burner Fuel Oil Train Piping Detail
31
Oil Pump Priming
34
Oil Filtration
34
Venting
34
Combustion Air Supply from the Boiler Room
37
Air Piped from Outside Boiler Room
38
Exhaust Venting
39
Common Venting Layouts for Vantage
39
Venting Terminations
41
Wall Thimble Installation
41
Roof Vent Termination
45
Side Wall Vent Termination
45
Removing an Existing Boiler
45
Electrical Connections
46
Assembly of Fulton Multi-Skid Systems
47
Operation
49
Perform Pre-Start-Up Inspection
50
Fill and Purge the System
50
Commission the Boiler
51
System Design and Boiler Operation
52
Siemens LMV36 and LMV37 Control
52
Operating Points on the Siemens Lmv Control
52
Normal Operation
52
Steps to Enter Parameters
54
Adjusting Fuel/Air Curve (Natural Gas or Propane or Modulating #2 Fuel Oil)
54
Adjusting Fuel/Air Curve (Multistage #2 Fuel Oil - Vtg-2000Df to Vtg-4000Df)
56
Viewing Flame Signal Intensity
57
Manual Control (Manual Request for Output)
58
Viewing Total Burner Start-Ups
59
Viewing Total Burner Hours
59
Changing Modbus Address
60
Viewing Lockout History
60
Parameter Backup
62
Parameter Restore
63
Operating Temperatures and Fuel Selection
64
Temperature Controller Instructions
65
Yokogawa Ut 32A Basic Programming
66
Access to Variable Speed Drive Blower Motor
67
Perform Test of Ignition Safety System
67
Perform Test of Low Water Cut off
67
Perform Test of Limit Controls
68
Perform Test of Low Gas Pressure Switch
68
Perform Test of High Gas Pressure Switch
68
General Operation of the Boiler
68
Maintenance
69
General
70
Daily Maintenance and Inspection Schedule
70
Weekly Maintenance and Inspection Schedule
70
Monthly Maintenance and Inspection Schedule
70
Annual Maintenance and Inspection Schedule
71
Annual Removal and Inspection of Le Bekaert Burner
72
Verification of Torque Settings on Fireside Access Doors
72
Inspecting/Cleaning the Flue Passages
75
Ignition Pilot Adjustment - Dual Fuel Burners
75
For Units with Riello Rls-100-130E Burner
75
For Units with Riello Rls-160E Burner
75
After All Repairs and Maintenance
75
Troubleshooting
75
Section 2
94
Introduction
96
Modsync Features
98
Installation
100
Location
101
Power Supply
101
Hydronic Boiler Interface
101
Temperature Sensors
102
Operation
104
Sequence of Operations
105
Screen Descriptions
106
Main Menu Screen
107
System Status Screen
108
Hydronic "Boiler Config" Configuration Screens
108
System Configuration Menu
110
System and Scaling Screen 1
110
Password and Screen Saver
115
Maintenance Configuration Screen 1
116
Maintenance Configuration Screen 2
116
Sensor Configuration
117
BMS Configuration
118
Alarm Configuration
119
Setback Schedule
120
Setpoint Configuration Without Outdoor Reset
121
Setpoint Configuration with Outdoor Reset
122
Outdoor Reset Configuration
123
Alarm Status
124
Lead / Lag Configuration 1
125
Lead / Lag Configuration 2
126
Lead / Lag Configuration 3
127
Network
130
Network Parameter Configuration and Address Listings
131
Port 2 Wiring Diagram (Slave) RJ-11 Type Serial Port
132
Boiler Modbus Network (Port 3)
133
Maintenance
138
Modsync Alarms
140
Backing up the Program
140
Battery Replacement
140
Common Troubleshooting Issues
141
Parts and Warranty
142
Modsync Limited Warranty
142
Specifications
143
Advertisement
FULTON Vantage VTG Series Installation And Operation Manual (96 pages)
Condensing Hydronic Boilers
Brand:
FULTON
| Category:
Boiler
| Size: 1.4 MB
Table of Contents
Operation Manual
1
Table of Contents
3
Introduction
5
Overview
6
Warnings & Cautions
6
Disclaimers and Local Codes
6
Installation
7
Product Overview
8
Placement & Rigging
9
Clearances and Serviceability
10
Install Boiler Trim
12
Install Water Piping
12
Meet Water Chemistry Requirements
15
Prevent Oxygen Contamination
15
Eliminate System Air
16
Fill the Boiler with Water
16
Install Gas Piping
16
Components Requiring Ventilation to the Outdoors
19
Install Condensate Drain
20
Install Ph Neutralization Kit
21
Install Oil Piping
21
Oil Piping (for Dual Fuel Boilers with the Riello Burner)
21
Hydraulic Connections
24
Oil Pump Priming
24
Oil Filtration
24
Venting
24
Combustion Air Supply from the Boiler Room
27
Air Piped from Outside Boiler Room
27
Exhaust Venting
28
Common Venting Layouts for Vantage
28
Venting Terminations
31
Wall Thimble Installation
32
Horizontal Vent Termination
33
Removing an Existing Boiler
33
Electrical Connections
34
Assembly of Fulton Multi-Skid Systems
34
Operation
37
Perform Pre-Start-Up Inspection
38
Fill and Purge the System
38
Commission the Boiler
39
System Design and Boiler Operation
39
Siemens LMV36 and LMV37 Control
40
Operating Points on the Siemens Lmv Control
40
Normal Operation
40
Initial Programming
40
Commissioning the Unit
41
Siemens LMV51 Control
42
Operating Points on the Siemens Lmv Control
42
Normal Operation
42
Pre-Ignition
42
Setting Pilot (for Boilers Equipped with a Pilot)
43
Setting Main Burner Ignition
44
Resetting the Alarm
44
Setting Modulation
45
Setting Low Fire
45
Setting the Complete Turndown Range
46
Operating Temperatures and Fuel Selection
47
Temperature Controller Instructions
47
Temperature Controller Basic Programming
47
Yokogawa Ut 32A Basic Programming
48
Siemens Rwf40 Basic Programming
49
Access to Variable Speed Drive Blower Motor
50
Test of Ignition Safety System
51
Perform Test of Low Water Cut off
51
Perform Test of Limit Controls
51
Perform Test of Low Gas Pressure Switch
52
Perform Test of High Gas Pressure Switch
52
General Operation of the Boiler
52
Maintenance
53
General
54
Daily Maintenance and Inspection Schedule
54
Weekly Maintenance and Inspection Schedule
54
Monthly Maintenance and Inspection Schedule
54
Procedure for Cleaning the Air Inlet Filter (Low Emissions Burners)
55
Annual Maintenance and Inspection Schedule
55
Annual Removal and Inspection of Le Bekaert Burner
56
Inspecting/Cleaning the Flue Passages
59
Besides Natural Gas or Propane
59
Replacing a Servomotor and Related Components
59
Ignition Pilot Adjustment - Dual Fuel Burners
60
For Units with Riello Rls-100-130E Burner
60
For Units with Riello Rls-160E Burner
60
After All Repairs and Maintenance
60
Troubleshooting
60
Warranty & Parts
65
Standard Warranty for Fulton Vantage Hydronic Boilers
67
Parts
69
Standard - Maxon Burner
70
Dual Fuel - Riello Burner
73
Low Emissions - Bekaert Burner
77
Annual Maintenance Kits
81
Spare Parts Kits
84
Advertisement
Related Products
FULTON VMP150
FULTON Vantage VTG 4000DF
FULTON Vantage VTG 2500
FULTON VSRT-15
FULTON VSRT-40
FULTON VSRT 40
FULTON Vantage VTG 2000DF
FULTON VSRT 50
FULTON VSRT-60
FULTON VSRT-30
FULTON Categories
Boiler
Winches
Jacks
Power Tool Accessories
Heater
More FULTON Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL