INSTALLATION
!
WARNING
All information in this manual is for
reference and guidance purposes,
and does not substitute for required
professional training, conduct, and strict
adherence to applicable jurisdictional/
professional codes and regulations.
2-36
level is used, the length should be appropriate for the skid). If assembling
multi-component support stands, attach sections using the supplied bolts
through the tank frame mounting plates. These should be hand tight until
all of the piping is assembled.
NOTE:
Note: skids are leveled at the factory using a laser level.
5. Connect the piping between the skids by matching the union connections
and/or ange stamps and tightening. Refer to the mechanical drawing as
necessary to con rm location of spool pieces etc. as the ange stamps are
shown on the drawing in hexagonal callouts. The ange stamps should
matched and aligned (the ange stamps should be directly across from
one another. Rotating a ange will result in piping misalignment). Bolts
should be hand tight until all of the piping is assembled. Refer to the
appropriate instructions to tighten the anges to the required torque
speci cations. Support pipe runs as required.
6. Ensure that a low point drain is installed in the piping.
7. Connect the conduit runs between the skids and tighten conduit
connectors.
8. Locate the supplied wiring for the equipment and pull wiring through
the appropriate conduit runs. Electrical wires are labeled for easy landing.
Connect all wiring per the Fulton supplied electrical drawings.
9. If a header is supplied, mount the header as shown in the mechanical
drawing.
NOTE:
For piping supplied in sections, make up and connect hand tight until all
sections are in place to ensure sections align properly. Sections are match marked
for reassembly.
10. Tighten all connections, including threaded and anged factory
connections which may loosen during shipment.
11. Pneumatically test the piping (at 15 psig [103 kPa]maximum) prior to lling
the systems.
12. Check bolts and connections for tightness after the rst heat up cycle.
Retorquing may be required.
SECTION 2
EDR-PURE-IOM-230608
© Fulton Group N.A., Inc. 2023