FULTON Endura EDR Installation, Operation And Maintenance Manual page 14

Condensing hydronic boilers 750,000 - 2,000,000 btu/hr featuring pure control
Table of Contents

Advertisement

INSTALLATION
FULTON ENDURA
CONDENSING HYDRONIC BOILER
FIGURE 4 SAMPLE PIPING LAYOUT, PRIMARY ONLY VARIABLE FLOW PIPING; SINGLE BOILER
FULTON ENDURA
CONDENSING HYDRONIC BOILERS
RETURN
WATER TEMPERATURE
SENSOR
HEATING HOT
WATER RETURN
FIGURE 5 SAMPLE PIPING LAYOUT, PRIMARY ONLY VARIABLE FLOW PIPING; MULTIPLE BOILERS
Note: Sample piping layout (P&ID) is a general representation of system installation. Good practice should be used in system
design, including but not limited to adequate pipe/valve sizing and natural ow path for system water.
2-8
AIR REMOVAL
HEATING HOT
WATER RETURN
TWO POSITION
AIR REMOVAL
MOTORIZED
ISOLATION VALVE
SUPPLY WATER
TEMPERATURE
SENSOR
REVERSE
RETURN
(SEE NOTE 4)
EDR-PURE-IOM-230608
HEATING HOT
WATER SUPPLY
VARIABLE SPEED
SYSTEM PUMP
EXPANSION TANK
NOTES:
1.
THIS IS A TYPICAL ARRANGEMENT FOR REFERENCE PURPOSES
ONLY. ACTUAL INSTALLATIONS MAY REQUIRE ADDITIONAL
COMPONENTS WHICH ARE NOT SHOWN FOR CLARITY.
2.
THIS DRAWING IS NOT FOR CONSTRUCTION PURPOSES.
VARIABLE SPEED
SYSTEM PUMP
EXPANSION TANK
NOTES:
1.
THIS IS A TYPICAL ARRANGEMENT FOR REFERENCE PURPOSE
ONLY. ACTUAL INSTALLATIONS MAY REQUIRE ADDITIONAL
COMPONENTS WHICH ARE NOT SHOWN FOR CLARITY.
2.
THIS DRAWING IS NOT FOR CONSTRUCTION PURPOSES.
3.
REFER TO THE INSTALLATION AND OPERATION MANUALS FO
INFORMATION REGARDING CLEARANCES AND INSTALLATION
REQUIREMENTS.
4.
THE PIPING CONFIGURATION SHOULD UTILIZE A REVERSE
RETURN HEADER TO PROPERLY BALANCE FLOW ACROSS THE
© Fulton Group N.A., Inc. 2023
SECTION 2
HEATING HOT
WATER SUPPLY

Advertisement

Table of Contents
loading

Table of Contents