FULTON Endura EDR Installation, Operation And Maintenance Manual page 59

Condensing hydronic boilers 750,000 - 2,000,000 btu/hr featuring pure control
Table of Contents

Advertisement

SECTION 3
EDR-PURE-IOM-230608
Questions? Please Contact Your Local Manufacturer's Representative
1) Con rm position of the fuel selection switch where
applicable.
2) Enter the password and parameter "400" will ash.
3) Press the enter (i/reset) button 2 times.
a. "P1" will ash and the curve point will be displayed.
NOTE:
P0 is the ignition position. Verify proper combustion
at the ignition position.
4) With "P1" ashing the fuel or air actuator may be
individually selected for combustion adjustments.
a. For the fuel actuator keep the "F" button depressed
and press the "-" or "+" button to adjust the fuel
actuator.
i. Any changes are automatically saved.
ii. Release the "F" button.
b. For the air actuator keep the "A" button depressed and
the press the "-" or +" button to adjust the air actuator.
i. Any changes are automatically saved.
ii. Release the "A" button.
c. With "P1" ashing use the "+" for the next curve point
and the "-" for going back to the previous curve point.
d. Repeat steps "a. " and "b. " above if changes are required
at any other curve point.
OPERATION
3-7

Advertisement

Table of Contents
loading

Table of Contents