FULTON Endura EDR Installation, Operation And Maintenance Manual page 101

Condensing hydronic boilers 750,000 - 2,000,000 btu/hr featuring pure control
Table of Contents

Advertisement

SECTION 5
EDR-PURE-IOM-230608
NOTE:
TO BE COMPLETED BY A FACTORY AUTHORIZED TECHNICIAN HOLDING A VALID ENDURA (EDR) CERTIFICATE OF REGISTRATION.
DATE
TECHNICIAN
TECH. COMPANY
ANNUAL MAINTENANCE:
Burner head removed and visually inspected
Burner head cleaned (air only)
Burner head reinstalled with new gaskets
Burner flange hardware torqued to spec (see Section 4 of IOM)
Low water probe(s) removed, cleaned, and reinstalled
Combustion air inlet filter replaced with new
Flame rod inspected and cleaned, or replaced
Direct spark ignition replaced with new and gap properly set
Special gas vent system and condensate drains inspected
Combustion air intake system inspected
Safety relief valve tested, replaced if it does not fully reseat
Open factory Service Bulletin(s) addressed (where applicable)
Software updated to the latest version (unless otherwise instructed by the factory)
Safety checks table completed
Combustion verification completed, adjust as necessary
WATER CHEMISTRY: Verify water chemistry is within specified limits, correct where required
pH (8.5-10.5)
Oxygen (<250 ppb)
Iron/Copper (<5 ppm)
Chloride (<200 ppm)
Hardness (<60 ppm)
Gylcol %
Water fill pressure at the boiler outlet/supply connection (>12 psi)
CONTROLS:
Software Version in Use
SAFETY CHECKS: Check all safeties below for proper operation and document the final settings.
DEVICE
Low Water Safety
Air Switch
Low Gas Pressure Switch
High Gas Pressure Switch
Blocked Exhaust Switch
Questions? Please Contact Your Local Manufacturer's Representative
SETTING
OPERATIONAL
SERVICE DOCUMENTS
ANNUAL MAINTENANCE CHECKLIST
TECH CERTIFICATE #
BOILER MODEL
BOILER NB/SERIAL #
VERSION:
DEVICE
High Temperature Limit
Fuel Train Leak Test
Blower/Premix Leak Test
ENDURA (EDR)
COMPLETE
COMPLETE
COMPLETE
COMPLETE
COMPLETE
COMPLETE
COMPLETE
COMPLETE
COMPLETE
COMPLETE
COMPLETE
COMPLETE
COMPLETE
(fill in tables below)
(fill in tables on reverse side)
ppb
ppm
ppm
ppm
%
psi
SETTING
OPERATIONAL
2023-0607-EDR-PURE-MX-FORM.PDF
5-9