Pre-Commissioning Installation Checklist - FULTON Endura XE Installation, Operation And Maintenance Manual

Condensing hydronic boilers
Table of Contents

Advertisement

SECTION 5
EXE-IOM-230112
NOTE:
TO BE COMPLETED BY INSTALLING CONTRACTOR.
DATE
CONTACT NAME
BOILER MODEL
ELECTRICAL & COMMUNICATION:
Electrical wiring to the boiler terminated and tested?
Voltage matches the data plate on the rear of the boiler? (120V 60Hz 1Ø)
Control wiring for lead/lag is terminated and tested?
Building automation wiring is terminated and tested?
SYSTEM PIPING
All hydronic piping to the boiler is completed and leak tested?
All hydronic piping has been fully flushed?
Note: Chemical cleaning must bypass the boiler; clean water flush must have strainers
at the boiler inlet
Circulating pumps are wired, tested, and ready for operation?
Motorized boiler isolation valves are wired, tested, and fully operational?
FLUE GAS EXHAUST VENT AND COMBUSTION AIR INTAKE:
Flue vent meets material type and requirements detailed in the IOM?
Flue and combustion air terminations meet minimum separation requirements
and are installed to prevent flue gas recirculation?
Condensate drain is completed and meets IOM installation requirements?
Combustion air louvers meet minimum SQFT detailed in IOM?
Mechanical draft controls are powered, tested, and fully operational?
FUEL PIPING
Supply gas piping and regulators are properly sized to ensure adequate gas supply
under all operating conditions? (Idle, Light Off, High Fire, etc.)
Use a manometer to measure the gas pressure at the fuel train inlet:
Does the measured gas pressure meet the requirement listed on the data plate
on the rear of the boiler?
Gas vents are individually run, properly upsized every 10 feet, and terminated to
atmosphere if required by Authority Having Jurisdiction?
Gas regulators installed minimum 10 feet of pipe from the boilers?
SITE SIGN-OFF
PRINT NAME
Questions? Please Contact Your Local Manufacturer's Representative
When complete, return a copy to your Fulton Representative and/or
the service organization performing commissioning ("start-up") services.
SERVICE DOCUMENTS

PRE-COMMISSIONING INSTALLATION CHECKLIST

JOB SITE NAME
PHONE NUMBER
BOILER NB/SERIAL #
DATE:
TITLE:
YES
NO
YES
NO
YES
NO
N/A
YES
NO
N/A
YES
NO
YES
NO
YES
NO
YES
NO
N/A
YES
NO
YES
NO
YES
NO
YES
NO
N/A
YES
NO
N/A
YES
NO
INCHES WC
YES
NO
YES
NO
N/A
YES
NO
N/A