FULTON Endura EDR Installation, Operation And Maintenance Manual page 35

Condensing hydronic boilers 750,000 - 2,000,000 btu/hr featuring pure control
Table of Contents

Advertisement

SECTION 2
EDR-PURE-IOM-230608
OUT TO
EXHAUST
TERMINATION
PVC
EXHAUST PIPE
PVC COUPLING
CPVC
STARTER PIECE
(SEE TABLE 8)
STAINLESS STEEL
ENDURA TO
CPVC APPLIANCE
ADAPTER
(SEE TABLE 8)
UPDATED ELBOW LOCATION. M.E.B. 8/18/14
EV
REVISION DESCRIPTION
FULTON ENDURA
HYDRONIC CONDENSING BOILER
Note: All installations must
be in compliance with local
and national codes. Typical
installation diagrams in this
manual are for reference
purposes only.
FIGURE 20 ENDURA COMMON EXHAUST VENTING; TYPICAL INSTALLATION GUIDELINES
Questions? Please Contact Your Local Manufacturer's Representative
FIGURE 19 ENDURA EXHAUST VENTING
MEH
N/A
N/A
8/21/14
B.O.M.
ELEC. ENG MECH. ENG CHECKED
REVISION HISTORY
ECCENTRIC INCREASER
OUT TO
EXHAUST
TERMINATION
STAINLESS STEEL
EXHAUST PIPE
STAINLESS STEEL
ENDURA ADAPTOR
(CONSULT YOUR
VENTING SUPPLIER)
AAF
KDB
8/21/14
8/18/14
APPROVED
COMMON EXHAUST HEADER
(SEE NOTES 4,5,6)
INSTALLATION
UP TO TERMINATION
SWEEPING 90° ELBOW
(SEE NOTE 8)
45° REDUCING TEE
(SEE NOTE 7)
NOTES:
1.
THIS IS A TYPICAL ARRANGEMENT FOR REF
PURPOSES ONLY. ACTUAL INSTALLATIONS
ALTERNATE OR ADDITIONAL COMPONENTS
SHOWN FOR CLARITY.
2.
THIS DRAWING IS NOT FOR CONSTRUCTIO
3.
REFER TO THE INSTALLATION AND OPERAT
INFORMATION REGARDING CLEARANCES AN
REQUIREMENTS.
THE COMMON EXHAUST HEADER SHOULD B
4.
A SLIGHT NEGATIVE PRESSURE WITHIN TH
OF THE BOILER. A POSITIVE PRESSURE CO
WILL REQUIRE ACCESSORIES TO GUARANT
CANNOT TRAVEL BACKWARD THROUGH AN
5.
A CONSTANT DIAMETER COMMON HEADER
DO NOT USE THE STATIC REGAIN METHOD
6.
A MINIMUM 1/4" RISE PER FOOT RUN IS RE
7.
A 45° REDUCING TEE OR ELBOW IN THE DI
IS RECOMMENDED. STRAIGHT OR 90° TEES
USED.
8.
DO NOT USE BOOT TEES OR BULL HEAD TE
9.
ENDURA BOILERS CANNOT BE COMMON VE
2-29

Advertisement

Table of Contents
loading

Table of Contents