FULTON Endura EDR Installation, Operation And Maintenance Manual page 104

Condensing hydronic boilers 750,000 - 2,000,000 btu/hr featuring pure control
Table of Contents

Advertisement

SERVICE DOCUMENTS
COMBUSTION SETTINGS: Fuel Type is:
FIRING POSITION:
Fuel Position
Air Position
Air Position
Air Position
Air Position
Blower Position
Air Position
Air Position
Air Position
Blower Ampere
Incoming Voltage
Supply Gas Pressure (InWC)*
Manifold Gas Pressure (InWC)*
MV Downstream Gas (InWC )*
Fan Discharge Pressure (InWC)*
Analyzer O2%
CO2 %
CO ppm
NOx @ 3%
Room Ambient Temp. °F
Combustion Air Temp. °F
Stack Temperature °F
Stack Draft (InWC)*
Inlet Water Temp. °F
Outlet Water Temp. °F
Main Flame Signal
OPERATING HISTORY
Boiler Online Hours
Boiler Run Hours
Boiler Cycles
When complete, please keep this form with the boiler and store a record copy in a safe location. Accurate and
complete combustion and maintenance records detailing compliance with the Installation, Operation, and
Maintenance Manual must be produced for warranty consideration. Please use photocopies or consult your local
Fulton Representative for additional copies of this form.
5-12
Natural Gas
P0
P1
P2
LIGHT
)*
* Use only a Slack Tube
Propane
P3
P4
P5
®
Manometer or equivalent. The use of a digital manometer is not recommended.
SECTION 5
EDR-PURE-IOM-230608
P6
P7
P8
2023-0607-EDR-PURE-MX-FORM.PDF
© Fulton Group N.A., Inc. 2023
P9
100%

Advertisement

Table of Contents
loading

Table of Contents