Commissioning Mode; Perform Test Of Limit Controls; Perform Test Of Low Gas Pressure Switch; Perform Test Of High Gas Pressure Switch - FULTON Endura+ Series Installation And Operation Manual

Condensing hydronic boilers
Table of Contents

Advertisement

OPERATION
!
WARNING
All information in this manual is for
reference and guidance purposes,
and does not substitute for required
professional training, conduct,
and strict adherence to applicable
jurisdictional/professional codes
and regulations.
Non-Fulton product information
is for reference purposes only. No
Fulton document should substitute
for full review of documentation
available from the component
manufacturer.
3-20
` USER CONFIGURATION
An administrator password can be assigned to the control to prevent
unauthorized access. The selected screens will require entry of the administrator
password prior to access. The password may be up to 10 characters in length.

Commissioning Mode

The boiler must be placed in commissioning mode prior to adjusting combus-
tion parameters. This screen is intended for trained factory authorized techni-
cians. This allows easy access to locking the SAS valve, and adjustments to %O2
setpoint for the O2 Compensation system at the firing rate ranges. Place the SAS
Control into No Lock and tap the Complete Commissioning button when setup is
fully completed to return to normal operation.

Perform Test of Limit Controls

Fire the boiler and test the high limit control as follows:
1. Alter high temperature limit to a value lower than the anticipated loop
temperature. Turn the boiler on. Water temperature will rise until the
boiler locks out. This condition has to be manually reset.
2. Alter the high limit cut off temperature to normal level, typically 10-20
degrees above set point.

Perform Test of Low Gas Pressure Switch

Test the low gas pressure switch as follows:
1. With the boiler running turn up the low gas pressure switch until a lock out
is annunciated.
2. Return the switch to normal setting, re-start the boiler.

Perform Test of High Gas Pressure Switch

Test the high gas pressure switch as follows:
1. With the boiler running turn down the high gas pressure switch until a lock
out is annunciated.
2. Return the switch to normal setting, re-start the boiler.

General Operation of the Boiler

Excessive cycling will reduce the useful life of any piece of mechanical
equipment. Endura+ boilers should be operated and controlled so the boiler
cycles less than 12,000 times per year.