After All Repairs And Maintenance - FULTON Endura EDR Installation, Operation And Maintenance Manual

Condensing hydronic boilers 750,000 - 2,000,000 btu/hr featuring pure control
Table of Contents

Advertisement

SECTION 4
EDR-PURE-IOM-230608

After All Repairs and Maintenance

1. Perform all Safety Checks as described in the Operation section.
2. Fire the boiler and perform a full combustion veri cation. Make
adjustments as necesary.
3. Complete the "Installation and Operation Report" or "Annual Maintenance
Checklist" and retain in the boiler's service history records.
NOTE:
Accurate and complete combustion and maintenance records detailing
compliance with the Installation, Operation and Maintenance manual must be
produced for warranty consideration.
Questions? Please Contact Your Local Manufacturer's Representative
MAINTENANCE
!
WARNING
All information in this manual is for
reference and guidance purposes,
and does not substitute for required
professional training, conduct,
and strict adherence to applicable
jurisdictional/professional codes and
regulations.
Never use open ame or other sources
of ignition to check for gas leaks.
Ensure boiler is o and cooled,
with proper lockout - tagout per
local codes prior to service and
maintenance.
4
CAUTION
Use caution when using any cleaning
solutions. Refer to local regulations for
proper cleaning solution disposal.
Do not allow dust or dirt to accumulate
around the boiler.
4-9

Advertisement

Table of Contents
loading

Table of Contents