Tender No. MET21-117 Design & Build RFP: Gas Heating Upgrade
The Tender Documents shall be amended and will become part of the Contract
Documents.
This addendum shall form an integral part of the Tender Documents.
1.
Design Consultant and Contractor shall be fully responsible in providing a
transport design plan that is acceptable to MRHA Project Manager and HNS BDG
Engineering. The Team shall provide back up materials on their determination of how
and what they intend to use to remove old boilers and heating system to be replaced
and to install new boilers from ground level temporary storage, shipping container or
like, at Alderney Manor to inside the penthouse mechanical boiler room.
Note, the roof shall not be used as a sitting staging area for craning of old and new
boilers and other heavy old and new equipment from ground into penthouse boiler room
and vice versa, unless there is an approved engineering structural assessment of the
roof with respect to the process that provides no detriment or undue risk to roof
structure and integrity. It is preferred by BDG and MRHA that a craned lift be continuous
from ground into penthouse and vice versa for all demolition and new craning of boilers
and equipment.
2.
The correct IOM manual for the new boilers follows this page and forms part of
this addendum.
The closing date and time remains the same.
Tender No. MET21-117
Metropolitan Regional Housing Authority
Replacement in Dartmouth
ADDENDUM NO. 5
July 27, 2021
Page 1 of 1
Design & Build RFP: Gas Heating Upgrade
Replacement in Dartmouth
Addendum #5 Page 1 of 105