Huawei UPS5000-S-400K-SM User Manual page 101

Hide thumbs Also See for UPS5000-S-400K-SM:
Table of Contents

Advertisement

UPS5000-S-(350 kVA-800 kVA)
User Manual
Mounting
Number of
Fitting
Fittings
Soft
2
connectin
g copper
bar
Grommet
N/A
strip
Middle
2
connectin
g plate
Step 1 Use a pallet truck to move the power cabinets and bypass cabinets to the
mounting holes for the cabinets with the power cabinets on the left and the
bypass cabinets on the right. Align the cabinets.
Step 2 Open the front doors of the power cabinets and bypass cabinets.
Step 3 Install the connecting plates between the bypass cabinet and its adjacent power
cabinet based on the following sequence: bottom, top, and middle connecting
plates.
Issue 12 (2023-05-26)
Screw
Specifications
M12x45
N/A
M6x30
NO TE
Use a pallet truck to adjust the position of the bypass cabinets to align the front doors of
the bypass cabinets with the front doors of the power cabinets.
Copyright © Huawei Digital Power Technologies Co., Ltd.
Number of
Torque
Bolts
(PCS)
10
47 N·m
N/A
N/A
4
3 N·m
3 Installation
Remarks
top of the cabinet,
attach grommet strips
on the hole edges to
protect cables.
Installed on the cabinet
before delivery.
92

Advertisement

Table of Contents
loading

Table of Contents