UPS5000-S-(350 kVA-800 kVA)
User Manual
Figure 3-25 Installing an expansion bolt (unit: mm)
1.
2.
3.
4.
----End
Combining Power Cabinets and Bypass Cabinets
The power cabinets and bypass cabinets are separately packed for delivery. Before
installing the UPS, combine the power cabinets and bypass cabinets. Before
combining the cabinets, ensure that the required fittings are complete.
lists the fittings.
Table 3-9 Fitting list
Mounting
Number of
Fitting
Fittings
Bottom
2
connectin
g plate
Top
2
connectin
g plate
Issue 12 (2023-05-26)
Drill holes in the ground by using a hammer drill. The hole depth is 52 mm to
60 mm.
Partially tighten the expansion bolt and vertically insert it into the hole. Knock
the expansion bolt using a rubber mallet until the expansion sleeve is fully
inserted into the hole.
Partially tighten the expansion bolt.
Remove the bolt, spring washer, and flat washer.
Screw
Specifications
M12x25
M6x30
Copyright © Huawei Digital Power Technologies Co., Ltd.
Number of
Torque
Bolts
(PCS)
8
47 N·m
8
3 N·m
3 Installation
Table 3-9
Remarks
● Fittings are delivered
with the UPS. You can
see the fittings after
unpacking the bypass
cabinet.
● The two soft copper
bars are numbered 52.
● If holes are drilled for
routing cables at the
91