Figure 40: Sliding The Frame Sliders Into The Rails; Figure 41: Installing The Cage Nuts - Mellanox Technologies Spectrum SN2740 Hardware User Manual

1u switch systems
Hide thumbs Also See for Spectrum SN2740:
Table of Contents

Advertisement

Install ten cage nuts in the desired slots of the rack: three cage nuts in the front part of each
Step 6.
cabinet post, and two cage nuts in the rear part of each cabinet post.
R
Attach the frame to the rack by using ten spacer cage nuts, and screw ten M6 pan head
Step 7.
screws - four in the front part of the rack, and 6 in its rear part. The recommended torque is
6.55-7.35 Nm. See
Place the frame in the cabinet.
Step 8.
Rev 2.2

Figure 40: Sliding the Frame Sliders into the Rails

Figure 41: Installing the Cage Nuts

Figure 41.
Mellanox Technologies
F
Installation
48

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents