Pay Attention! • All servers and systems in the rack should be planned with the airflow direction. All FRU components must have the same air flow direction. A mismatch in the air flow will affect the heat dissipation. • The FRUs are extractable. The rails should be attached to the ports side of the system, so this side is adjacent to the cabinet.
Page 3
Package Contents 16X* 1/2X** * 14X screws for use + 2X spare units **According to customer order...
Page 7
Connector (Front) Side Externally Managed Systems FRU (Rear) Side * It may take up to five minutes to turn on the system. If the System Status LED shows red after five minutes, unplug the system and contact your Mellanox representative.
Need help?
Do you have a question about the SX6015 and is the answer not in the manual?
Questions and answers