Figure 11: Sliding The Blades In The Rails - Mellanox Technologies SB7700 User Manual

1u edr 100gb/s infiniband switch systems
Hide thumbs Also See for SB7700:
Table of Contents

Advertisement

Secure the system in the rack by tightening the 8 screws inserted in Step 4 and Step 5 with a
Step 6.
torque of Min 2Nm.
2.4.1.1 Removing the System from the Rack
 To remove a unit from the rack:
Turn off the system and disconnect it from peripherals and from the electrical outlet.
Step 1.
While your installation partner is supporting the system's weight:
Loosen the screws attaching the brackets to the rack. Do not remove them yet.
Step 2.
Loosen the screws attaching the blades to the rack, and pull the blades towards you, while your
Step 3.
partner is holding the system.
Extract the loosened screws from Step 2 and dismount the system from the rack.
Step 4.
Remove the rails and brackets from the chassis by unscrewing 8 screws.
Step 5.

Figure 11: Sliding the Blades in the Rails

Mellanox Technologies
Rev 1.2
19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sb7790

Table of Contents