•
The front drive bays are fully populated with 12 LFF or 24 SFF drives.
•
High performance fans are installed in all fan bays.
Procedure
1.
Power down the server.
2.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3.
Do one of the following:
•
Extend the server from the rack.
•
Remove the server from the rack.
4.
Remove the access panel.
5.
Do one of the following:
For primary bays, remove the riser cage.
For secondary bays, remove the rear wall blank.
Hardware options installation
113