HPE ProLiant DX380 Gen10 User Manual page 73

Table of Contents

Advertisement

This server supports the 96W HPE Smart Storage Battery with the 145mm cable.
Installing a Smart Storage Battery
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
The components included with the hardware option kit
NOTE: System ROM and firmware messages might display "energy pack" in place of "Smart Storage Battery." Energy pack
refers to both HPE Smart Storage batteries and HPE Smart Storage Hybrid capacitors.
Procedure
1.
Power down the server .
2.
Do one of the following:
Disconnect each power cord from the power source.
Disconnect each power cord from the server.
3.
Do one of the following:
Extend the server from the rack.
Remove the server from the rack.
4.
Remove the access panel.
5.
Do one of the following:
Remove the air baffle.
If installed on LFF models, remove the midplane drive cage.
6.
Install the Smart Storage battery.
7.
Install the cable.
Hardware options installation
73

Advertisement

Table of Contents
loading

Table of Contents