•
Disconnect each power cord from the power source.
•
Disconnect each power cord from the server.
3.
Do one of the following:
•
Extend the server from the rack.
•
Remove the server from the rack.
4.
Remove the access panel.
5.
Remove the primary riser cage.
6.
Remove the FlexibleLOM blank.
7.
Install the FlexibleLOM adapter.
Hardware options installation
144