line-CVM-D32
ARON, Three-phase mains measuring with 3-wire connection and transformers with ARON connec-
tion.
To validate the option, hold down key
Use key
to skip to the next programming point.
6�1�5�- CALCULATION PERIODS
This screen enables configuration of device calculation periods.
Hold down key
to set the aggregation period, i.e. measurement integration period
.
PERIOD)
to set the integration period for maximum demand calculation
Hold down key
Use keys
and
to modify the digit's value.
Press key
to skip through the digits.
Hold down key
to validate the value.
Aggregation period:
Minimum value: 1 minute.
Maximum value: 60 minutes.
Note: The programmed value must be divisible by 60, i.e. the division 60 / Aggregation period must
be exact.
Maximum demand integration period:
Minimum value: 1 minute.
Maximum value: 60 minutes.
Use key
to skip to the next programming point.
Instruction Manual
.
AGGREGATION PERIOD
15
min
PD PERIOD
15
min
MEASURE
SETUP
(AGGREGATION
.
(PD PERIOD)
47
Need help?
Do you have a question about the Line-CVM-D32 and is the answer not in the manual?