Wiring Specifications - Carrier TruVu VVTBP-E2 Installation And Startup Manual

Table of Contents

Advertisement

To communicate through the BACnet/Service port network
13 Click Apply.
14 On the right of the page, in the Networks using selected connection table, click the checkbox next to the
network you want to connect to.
15 Click Apply.
16 Select the BACnet/IP Service Port Connection and click Start. The status changes to Connected.
17 Click Accept.
18 On the navigation tree, right-click the controller that you are connected to and select Module Status. If a
Modstat report appears, the i-Vu® application is communicating with the controller.

Wiring specifications

For...
Ethernet - not
daisy chained
Ethernet - a
daisy chain
configuration
MS/TP *
* See the MS/TP Networking and Wiring Technical Instructions.
WARNINGS
Do not apply line voltage (mains voltage) to the controller's ports and terminals.
Do not exceed the minimum bend radius of the Cat5e or Cat6e Ethernet cable. Refer to Ethernet cable
manufacturer specifications for minimum bend radius.
TruVu™ VVTBP-E2
Installation and Start-up Guide
Use...
Cat5e or higher Ethernet cable
Cat5e or higher Ethernet cable
22 AWG, low-capacitance, twisted, stranded,
shielded copper wire
Maximum Length
328 feet (100 meters)
164 feet (50 meters)
2000 feet (610 meters)
64
©2022 Carrier.
All rights reserved.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tv-vvtbp-e2

Table of Contents