Subassembly 03: Process Gas Line - Xylem WEDECO SMOevo PLUS Series Original Manual

Ozone generating system
Table of Contents

Advertisement

5.3.3 Subassembly 03: Process Gas Line

03.1.10
Pressure
gauge
03.1.15
Motor control
valve with
actuator
03.1.20
Check valve
03.1.25
Ball valve
Option: Ozone Monitor M1 / M2
03.1.01
Solenoid
valve
Manual_SMOevoPLUS_eng_01.2019.doc
Manual Ozone Generating System SMOevo
To read the operating pressure of the ozone generator.
Refer to the setpoints in Chapter Operating Data.
To set the gas volume flow of the ozone system via touch
panel.
Refer to Chapter Operation .
valve closes automatically.
To secure the system against flow in opposite direction.
Open in normal operation. To be closed manually only in case
of shutting down the system for a longer period of time, e. g.
for maintenance purposes.
The branch for connection of the optional ozone monitor (M1,
M2) is located downstream the ozone generator. An ozone
monitor can calculate the produced ozone mass in a precise
way.
Refer to Chapter Control Modes.
Optionally an automatic control for calculation of the required
ozone mass can be included, e. g. in connection with an
external setpoint device.
System Description
In case of fault or outage the
page 51 of 179
PLUS

Advertisement

Table of Contents
loading

Table of Contents