Requirements For The Installation Place - Xylem WEDECO SMOevo PLUS Series Original Manual

Ozone generating system
Table of Contents

Advertisement

Do not enter the operating room until the ozone concentration has fallen below the
alarm limit value.
Preferably use CO
Never extinguish fire in or at the electrical cabinet with water.
Immediately inform a physician or emergency service and provide first aid if a person
has been injured.
Notify your superior of all accidents.

3.6 Requirements for the Installation Place

Location
Technical
Ventilation
Special Safety
Manual_SMOevoPLUS_eng_01.2019.doc
The air in the filter of the breathing mask is sufficient for
approximately 10 minutes.
fire extinguishers in case of fire.
2
Ensure that the ozone system is installed in a closed, frost-free,
lockable room. Air-conditioned rooms are recommended.
Ensure that the ozone system is protected from direct sunlight.
The installation foundation must be designed for the operating
weight of the ozone system.
The installation surface must be dimensioned in such way that
operation, maintenance, and repair can be easily carried out.
Sufficient space for air circulation around the ozone system must be
included.
Refer to Chapter Operating Room.
Do not allow permanent workplaces or work stations in rooms
housing ozone systems. If the installation site of the system cannot
be separated from the workplace for technical processing reasons,
reliably monitor the ozone concentration in the ambient air. Ensure
the maximum allowable threshold limit value of 0.2 mg/m
(≈ 0.1 ppm
) is not exceeded.
v
Ensure that rooms housing ozone systems are equipped with a
technical ventilation system guaranteeing an air exchange of at
least three times per hour. An extraction type ventilation must exist
with the intake opening located directly above the floor. The
ventilation system must turn on automatically when a gas detector
responds to the potential danger.
The installation place of the ozone system must be in accordance
with the locally applicable occupational health and safety
regulations. In particular, observe the regulations with regard to
room ventilation, accessibility, and escape routes.
Ensure that rooms are effectively monitored regarding room
ventilation by means of gas detectors with visual and acoustic
Manual Ozone Generating System SMOevo
Refer to Chapter Dimensions and Weights.
PLUS
Safety
3
page 24 of 179

Advertisement

Table of Contents
loading

Table of Contents