13. Make sure to secure excavator onto trailer before
transporting. Place blocking (1, Figure 172) in front of and
behind each track. Use chains or cable tie-downs (2) as
required by local transportation laws.
14. Refer to Dimensions for Transportation table and drawing
for overall machine height and width measurements. Make
sure to position excavator as shown. If not transported in
this position, height measurements may be different.

LIFTING WITH SLING

Improper lifting can allow load to shift and cause injury or
damage.
1.
Refer to "Specification" on page 7-1 of this manual for
information on weight and dimensions.
2.
Use properly rated cables and slings for lifting.
3.
Position machine for a level lift.
4.
Lifting cables should have a long enough length to prevent
contact with machine. Spreader bars may be required.
NOTE:
If spreader bars are used, be sure that cables
are properly secured to them and that angle of
cables is factored into lift strength.
Transportation
5-10
WARNING
1
2
Figure 172
Figure 173
1
FG015857
OP001124