Hour / Yearly Service - Doosan DX700LC Operation And Maintenance Manual

Table of Contents

Advertisement

2,000 HOUR / YEARLY SERVICE

Perform All Daily, 50, 250, 500 and 1,000
Hour Service Checks
Change Swing Reduction Device Oil
NOTE:
Change swing reduction device oil after first 250
hours of operation or rebuild and every 2,000 hours
thereafter.
The gear oil is very hot after the machine has been
operating. Shut all systems down and allow them to cool.
1.
Set a container under excavator.
2.
Release the drain plug (3, Figure 91) and drain the swing
reduction device oil into a container.
NOTE:
Dispose of drained fluids according to local
regulations.
3.
After draining oil, tighten the drain plug.
4.
Remove breather/fill cap (2, Figure 90) and add oil to "H"
mark on dipstick (1).
Inspection, Maintenance and Adjustment
WARNING
2
2
1
Figure 90
Figure 91
Figure 92
1
FG015801
3
3
FG016119
FG000419
OP001123
4-51

Advertisement

Table of Contents
loading

Table of Contents