Doosan DX700LC Operation And Maintenance Manual page 287

Table of Contents

Advertisement

2.
Turn superstructure so it is perpendicular to side frame to
be extended.
NOTE:
Do not attach cable on side frame step.
3.
Attach one end of cable (1, Figure 161) (6 x 19 normal Z to
ø14 – ø16 A type) on arm (2) and other end on side frame
(3). Connect it with an appropriate holding device on both
ends.
4.
Raise side frame (3, Figure 161) slightly with jack and
block (4). Extend arm (2) gradually to slide side frame out
until it hits stop.
5.
After side frame (1, Figure 162) has slid into place, lower
superstructure to ground. Remove cable.
6.
Install ten spacers, harden washers and bolts (2, Figure
162).
NOTE:
Tighten bolts to 288 kg•m (2,083 ft lb).
NOTE:
Repeat procedure at other track frame support.
7.
After bolts for one side frame are fastened, repeat Steps
thru 6 for other side frame.
Transportation
2
3
1
Figure 161
1
2
Figure 162
4
FG016366
FG016368
OP001124
5-5

Advertisement

Table of Contents
loading

Table of Contents