Adjusting The Valve Timing - Husqvarna FE 350 2015 Repair Manual

Table of Contents

Advertisement

ENGINE
18
18.5.24

Adjusting the valve timing

-
Remove the special tool.
Adjustment bush bridge (77229050044)
Insert, timing chain tensioner (77229035000)
Condition
Camshaft gears were loosened.
O
-
Mount special tool
and tension the timing chain.
I
Insert, timing chain tensioner (77229035000)
8.
-
Remove screws
-
Position the special tool.
I
Adjustment bush bridge (77229050044)
✓ The valves are not activated.
✓ The special tool must be in full contact with the flat areas of the cam shafts.
-
Mount and tighten screws
Guideline
Screw, special tool,
adjustment bush bridge
Info
I
Tighten the screws of the exhaust camshaft first.
8.
-
Tighten screws
Guideline
Screw, camshaft drive
sprocket
@).
-
Remove screws
-
Remove the special tool.
I
Adjustment bush bridge (77229050044)
(0
p. 295)
(0
p. 294)
(0
p. 294)
(0
p. 295)
@).
M7x1
10 Nm
(7.4 lbf ft)
M12x1
70 Nm
(51.6 lbf ft)
(0
p. 295)
190
Lubricated with
engine oil
Loe-
tite
243
/cone
®
degreased

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents