2.3

Average task duration

Hardware: 10 minutes
The average task duration including preliminary and concluding steps is
indicated at the beginning of each procedure next to the procedure class.
The following table gives an overview of steps taken into account for
calculating the average task duration.
Step
Server shutdown
Rack removal,
disassembly
Transport
Maintenance
procedures
Transport
Assembly, rack
installation
Starting up
Table 1: Calculation of the average task duration
RX1330 M4
included
Explanation
Shutdown time depends on hardware and
software configuration and may vary
significantly.
no
Software tasks necessary before
maintenance, see
maintenance task" on page
Making the server available, removing the
yes
server from the rack (if applicable).
Transporting the server to the service table
no
(where required) depends on local
customer conditions.
Maintenance procedures including
yes
preliminary and concluding software tasks.
Returning the server to its installation site
no
(where required) depends on local
customer conditions.
Reassembling the server, installing the
yes
server in the rack (if applicable).
Booting time depends on hardware and
no
software configuration and may vary
significantly.