Average Task Duration - Fujitsu PRIMERGY CX400 M6 Upgrade And Maintenance Manual

Table of Contents

Advertisement

Removing and installing Field Replaceable Units involves complex
maintenance procedures on integral server components. Procedures will
require shutting down, opening and disassembling the server.
CAUTION
Maintenance procedures involving Field Replaceable Units must be
performed exclusively by Fujitsu service personnel or technicians
trained by Fujitsu. Please note that unauthorized interference with the
system will void the warranty and exempt the manufacturer from all
liability.
Components that are handled as Field Replaceable Units
– HDD/SSD backplane
– HDD/SSD bridge board
– Fan module
– High speed riser module
– Power distribution board
– Front panel
– Front panel cable
– Thermal cable
Please ask your local Fujitsu service center for more information.
2.3

Average task duration

Hardware: 10 minutes
The average task duration including preliminary and concluding steps is
indicated at the beginning of each procedure next to the procedure class.
The following table gives an overview of steps taken into account for
calculating the average task duration.
CX400 M6
Upgrade and Maintenance Manual
Before you start
19

Advertisement

Table of Contents
loading

Table of Contents