To execute auto shutdown after power fail, you should install the FJBU
management software. How to install and configure the FJBU
management software, see the "Fujitsu Battery Unit" user guide.
6.5.2
Removing an FJBU
Customer Replaceable
Unit (CRU)
Tools:
tool-less
Note for servers using CMA (Cable Management Arm)
Regarding of removing the FJBU, additional tasks are needed, due to an
interference between CMA stopper and the FJBU.
▶ Push the lock spring inward to unlock the CMA stopper, see
CAUTION
▶
In case of not enough space at the under side, unlock the CMA
stopper of the server below and pull out the CMA to the rear
side.
▶ Remove the CMA stopper with the mounted crossbar, see
▶ Hold the CMA stopper, the crossbar and the CMA including cables in the
one hand.
▶ Remove the FJBU (see
▶ Mount the complete assembly (CMA stopper, the crossbar and the CMA)
again into the rail.
Preliminary steps
No steps needed.
RX1330 M4
Figure
35) and install the new PSU carefully.
Upgrade and Maintenance Manual
Power supply unit (PSU)
Hardware: 5 minutes
Figure
Figure
33.
34.
125