Average Task Duration - Fujitsu PRIMERGY CX2550 M2 Upgrade And Maintenance Manual

Table of Contents

Advertisement

Before you start
2.2

Average task duration

Average task duration: 10 minutes
The average task duration including preliminary and concluding steps is
indicated at the beginning of each procedure next to the procedure class.
Refer to
table 1 on page 22
calculating the average task duration:
Step
Server node
shutdown
Rack removal,
disassembly
Transport
Maintenance
procedures
Transport
Assembly,
rack installation
Starting up
Table 1: Calculation of the average task duration
22
for an overview of steps taken into account for
included
Explanation
Shutdown time depends on hardware and
software configuration and may vary
significantly.
no
Software tasks necessary before
maintenance are described in section
"Completing the maintenance task" on
page
Making the server available, removing the
yes
server from the rack (if applicable).
Transporting the server to the service table
no
(where required) depends on local
customer conditions.
Maintenance procedures including
yes
preliminary and concluding software tasks.
Returning the server to its installation site
no
(where required) depends on local
customer conditions.
Reassembling the server, installing the
yes
server in the rack (if applicable).
Booting time depends on hardware and
no
software configuration and may vary
significantly.
Upgrade and Maintenance Manual
61".
CX2550 M2

Advertisement

Table of Contents
loading

Table of Contents