Epson C8 Series Manipulator Manual page 246

6-axis robots
Hide thumbs Also See for C8 Series:
Table of Contents

Advertisement

Maintenance 6. Joint #2
8.
After fixing the Arm #2, fix the Arm #1 side arm.
Hexagon socket head cap bolts: 8-M6×25 (with a plain washer)
Tightening torque: 18.0 ± 0.9 N·m
9.
Install the Joint #2 pulley 2 to the Joint #2 shaft.
Hexagon socket head cap bolts: 2-M5×10
Tightening torque: 3.9 ± 0.2 N·m
C8, C8L:
Insert the pulley 2 so that one of the set screws is at the flat
face of the shaft. The brass bushing is not necessary for the
screw for the flat surface.
screw and then fix the screw.
C8XL:
Set the key to the shaft and insert the pulley 2 while aligning to the key groove. The brass bushing
is not necessary for the screw for the flat surface. Set the bushing to the other screw and then fix
the screw.
NOTE
If the screw positions are incorrect or the bushing is not set, it may cause damage on the side of the
brake and may result in the part being unable to be removed.
10. Install the battery box.
Countersunk screws: 2-M3×8
Tightening torque: 0.45 ± 0.1 N·m
11. Install the following parts.
Battery
Battery board
Battery connector
For details, refer to Maintenance 11.2 Replacing the Battery Board, Installation steps (2) to (5).
12. Install the Joint #2 timing belt.
For details, refer to Maintenance 6.3 Joint #2 – Replacing the Timing Belt, Installation steps (1) to (2).
232
(with a brass washer)
Set the bushing to the other
C8 Rev.13

Advertisement

Table of Contents
loading

This manual is also suitable for:

C8lC8xl

Table of Contents