Epson C8 Series Manipulator Manual page 203

6-axis robots
Hide thumbs Also See for C8 Series:
Table of Contents

Advertisement

Installation: Joint #1 Reduction gear unit (M/C Cable Backward)
1. Install the Joint #1 reduction gear unit.
Hexagon socket head cap bolts: 12-M6×50
Tightening torque: 18.0 ± 0.9 N·m
Installation face of the base reduction gear unit has clearance
holes.
Install the reduction gear unit to match the screws and the
clearance holes.
2. Install the Arm #1 to the base.
Hexagon socket head cap bolts: 15-M6×30 (with a plain
washer)
Tightening torque: 18.0 ± 0.9 N·m
■ There is a possibility of hands and fingers being caught and/or damage or
CAUTION
3. Connect the grease tube for the Arm #1 side to the fitting.
4. Pass the internal cables from the Arm #1 side to the base.
Protect the connectors with masking tapes.
- To protect the connector's clips
- To avoid adherence of cable grease
NOTE
Disconnect the cables one by one in order from the largest
connector to the smallest one.
Do not attempt to pull all connectors at once.
Doing so may damage the cables.
C8 Rev.13
malfunction to the Manipulator. Be very careful when installing the arm. Have
at least two workers so that one can support the Manipulator while the other
worker is removing the bolts.
Maintenance 5. Joint #1
189

Advertisement

Table of Contents
loading

This manual is also suitable for:

C8lC8xl

Table of Contents