Figure 2.2 Correctly Installed Din Rail Kit; Figure 2.3 Removing The Din-Rail - Advantech EKI-7706 Series User Manual

4fe+2g sfp/4ge+2g sfp l2 managed switch
Table of Contents

Advertisement

See the following figure for an illustration of a completed DIN installation proce-
dure.
3.
Grasp the bottom of the switch and slightly rotate it upwards. If there is resis-
tance, the switch is correctly installed. Otherwise, re-attempt the installation pro-
cess from the beginning.
2.3.1.2
Removing the DIN-Rail Mounting Kit
1.
Ensure that power is removed from the switch, and disconnect all cables and
connectors from the front panel of the switch.
2.
Push down on the top of the DIN rail clip release tab with your finger. As the clip
releases, lift the bottom of the switch, as shown in the following illustration.
\

Figure 2.2 Correctly Installed DIN Rail Kit

Figure 2.3 Removing the DIN-Rail

10
EKI-7706 Series User Manual

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents