Download Print this page

Landoll Brillion SS16 Operator's Manual page 44

Sure stand ag seeder
Hide thumbs Also See for Brillion SS16:

Advertisement

Acre Meter Installation -
Optional
Used with No Clutch, Basic Clutch or Console
w/Clutch Control
The acre meter consists of three main parts: the Acre
Meter, the Pick-up Switch and the Magnet Wheel
Assembly.
1. Attach the Acre Meter Angle to the end transmission
with 5/16-18 x 1 Bolts, Lock Washers and Nuts. See
Figure 2-24.
2. Attach the Pick-up Switch to the Acre Meter Angle
with #8-32 x 1-1/4 Screws, Lock Washers and Nuts.
Do not tighten screws at this time.
3. Attach the Pick-up Switch short ground wire to the
small hole in the Acre Meter Angle with a #6-32 x 1/2"
Screw and Nut, remove paint under the wire
connector to assure a good electrical ground
connection. See Figure 2-23.
4. Adjust the Pick-up Switch and bracket so the
centerline of Magnet Wheel Assembly and Pick-up
Switch are horizontally and vertically aligned with
maximum 1/8" between Magnet Wheel Assembly and
Pick-up Switch. Firmly tighten all screws. See
Figure 2-23.
NOTE
Alignment of the Pick-up Switch and Magnet Wheel
Assembly is critical. Improper alignment will cause the
acre counter to record acres erratically or not at all.
5. Attach the Acre Meter Assembly to the Acre Meter
Bracket with 3/8-16 x 1-1/4 Bolt, Flat Washer, Lock
Washer and Nut.
6. Route the cord from the Acre Meter up to the Pick-up
Switch and connect the mating plugs.
7. Do Not secure cord until all other optional equipment
is installed. Securely fasten the cord with tie wraps to
prevent cord from becoming entangled or rubbing on
moving parts.
8. Program the acre counter following the instructions.
See "Brillion Elite Mini Monitor" on page 3-12.
2-26
TABLE OF CONTENTS
Ground
Wire
Pick-up
Switch
Figure 2-23: Acre Meter Mounting Dimension
Acre Meter
Angle
1/8"
Maximum
Magnet Wheel
Assembly
F-1021-0422

Advertisement

loading

This manual is also suitable for:

Brillion ssp16