Link Operational
The NNP icon appears as green in color in the MOSS-E View panel. This
continues the Link ready status, and means that the control point is ready and the
configuration is active.
Controller Configuration and Management (CCM)
For configuring and managing APPN/HPR or IP resources in an OS/2 environment.
The above panel shows CCM without an open configuration.
Refer to Chapter 5, "Telnet IP Resource Management in CCM and MOSS-E" or to
the CCM: Users Guide, SH11-3081.
4-9
Chapter 4. Working with Network Node Processor (NNP) Functions