Control Point Management - IBM 950 User Manual

Nways multiprotocol controller
Table of Contents

Advertisement

CP/NNP Messages
CP/NNP-A (or -B) Status
CP/NNP-A
CP/NNP-B
Automatic configuration activation
Enable CP/NNP backup
Table 4-1. Control Point Management
Options
Automatic configuration
activation
Enable CP/NNP Backup
Automatic Configuration
Activation
Enable CP/NNP Backup
Automatic Configuration
Activation
Enable CP/NNP Backup
Automatic Configuration
Activation
Enable CP/NNP Backup
Start CP
4-2
3746-950: User's Guide
This message area shows you the progress of a chosen function.
Information on the links between the service processor, network node
processor, and controller. The status can be any of the following:
Down
Standby
Waiting for operator activation
Link not ready
Link ready
Link operational
More status information is given in "NNP Status Area Messages" on
page 4-4.
This button is for working with NNP A control point functions.
This button is for working with the NNP B control point functions.
Enables automatic resource activation after a network failure (see
Table 4-1).
Activates dual NNP functions (see Table 4-1).
Status
Comments
Off
Click Stop and restart CP, Shutdown and restart NNP, or an active
NNP failure to stop all active sessions, and then restart the control
point up to Waiting for operator activation status.
Off
Click Activate configuration to reactivate resources.
On
Click Stop and restart CP, or Shutdown and restart NNP to
restart the control point, automatically reactivating the active
configuration.
Off
An active NNP failure will drop the active sessions.
Off
No operator action available.
An active NNP failure will activate the backup network node
processor up to the Waiting for operator activation status.
On
Then do the following:
1. Set the Enable CP/NNP backup option to Off.
2. Click Activate configuration to reactivate resources.
On
No operator action available.
An active NNP failure results in the following:
1. Activates and starts the backup network node processor.
On
2. Activates the configuration (dropping resources temporarily).
3. Reactivates active sessions.
Initiates the control point program after using Stop CP.

Advertisement

Table of Contents
loading

This manual is also suitable for:

3746

Table of Contents