IBM 950 User Manual page 59

Nways multiprotocol controller
Table of Contents

Advertisement

Stop CP
Ends the control point program without deactivating the network node
resource configuration. Connecting to additional resources is no longer
possible.
Stop and restart CP
Select this button to:
1. Stop control points
2. Automatically restart the control point
3. Automatically reactivate a configuration This will only work if
Automatic configuration activation is selected (see page 4-2)
Activate configuration
Manually activates configuration of NN resources when Automatic
configuration activation is not selected. Use this after the Start CP
button.
Dump CP
To be used only by an IBM representative.
Help
Online information for managing the control point program.
Close
Saves changes and returns to the previous panel.
Shutdown and restart NNP
This button performs the following:
1. Stops the control point program
2. Deactivates the configuration
3. Shuts down the NNP
4. Restarts the NNP
If Automatic configuration activation was selected, then this button
also:
1. Restarts the CP program
2. Reactivates the configuration
Manage NPM
Allows you to add, update, or remove a NetView Performance Monitor
(NPM) configuration.
Chapter 4. Working with Network Node Processor (NNP) Functions
4-3

Advertisement

Table of Contents
loading

This manual is also suitable for:

3746

Table of Contents